In the Monochromator hutch:

 

 
We use a liquid He vessel to have He flux in Mono chamber   He Level in Mono Hutch - Visualization on Monitor in Control Room

Ball must be between 2 marks
Ball down means there is NO MORE He in Mono chamber. Stop immediately the beam! Danger for Be window !!!!

 

To change He bottle:

 

1) First thing to do:
Close mechanical valve 0 in Experimental hutch
  2) Close mechanical valve 1 in Mono hutch
 

 
3) Close mechanical valve 3 in Mono hutch   4) You are ready to pump Mono chamber
 
Connect pumping group to Mono chamber

 
5) Verify that Mono Hutch Electronic Valves are open   6) Open completely mechanical valve 2 in Mono hutch to pump the whole chamber
Image 'vacuum synopsis'  

 
7) Call Floor coordinator (25-25) to get a new liquid He bottle
Connect it - Note new date on camera field of view

9) Close mechanical valve 2 - Stop pumping

11) Do not forget to reopen mechanical valve 0 in Experimental Hutch before working
  8) Check vacuum state on jauge



10) Open mechanical valve 1, then 3
He surpression must go up the ball