Table 2
FRONT-ENDS DELIVERING BEAM (17 ids, 9 BMs)
ID2 |
High Brilliance |
BM1/CRG |
Swiss-Norwegian |
ID3 |
Surface Diffraction |
BM2/CRG |
D2AM |
ID6 |
Machine Diagnostics |
BM5 |
Optics |
ID9 |
White Beam |
BM7/CRG |
Graal |
ID10 |
Troïka |
BM8/CRG |
Gilda |
ID11 |
Materials Science |
BM14 |
MAD |
ID12 |
Circular Polarisation (UHV) |
BM16 |
Powder Diffraction |
ID13 |
Microfocus |
BM29 |
EXAFS |
ID15 |
High Energy |
BM32/CRG |
IF Interface Studies |
ID16 |
Inelastic Scattering |
|
|
ID17 |
Medical |
|
|
ID18 |
Mössbauer |
|
|
ID19 |
Topography |
|
|
ID20 |
Magnetic Scattering (UHV) |
|
|
ID24 |
Dispersive EXAFS |
|
|
ID30 |
High Pressure |
|
|
ID32 |
Surface Science (UHV) |
|
|
FRONT-ENDS READY FOR RADIATION TESTS OR TO DELIVER BEAM (5 IDs, 3BMs)
ID1 |
Anomalous Scattering |
(FE ready for radiation tests - July 96) |
ID14 |
Protein Crystallography |
(FE ready for radiation tests - August 96) |
ID21 |
X-ray Microscopy (UHV) |
(FE ready for radiation tests - October 96) |
ID22 |
X-ray Fluorescence Probe |
(FE ready for radiation tests - September 96) |
ID26 |
XAUS (UHV) |
(FE to be completed by July 96 - radiation tests October 96) |
BM26/CRG |
Dubble (wide beam) |
(FE to be completed by July 96 - radiation tests November 96) |
BM28/CRG |
XMAS |
(FE ready for delivering beam) |
BM30/CRG |
FIP (wide beam) |
(FE ready for radiation tests - July 96) |
FRONT-ENDS ALMOST FULLY INSTALLED (5IDs, 3BMs)
ID23 |
Not used |
|
ID27 |
Front-end test |
|
ID28 |
Not used |
(FE to be completed end 96) |
ID29 |
Not used |
(FE to be completed 97) |
ID31 |
Not used |
(FE to be completed 97) |
BM20/CRG |
ROBL |
(FE to be completed before end 96 - radiation tests 97) |
BM27 |
Not used |
(FE will be completed end 96) |
BM31 |
Not used |
(Module 1 installed to be used vacuum group tests before end 96) |
Table 2: Status of front-ends as of June 1996.