FRONT-ENDS DELIVERING BEAM (17 ids, 9 BMs)

ID2

High Brilliance

BM1/CRG

Swiss-Norwegian

ID3

Surface Diffraction

BM2/CRG

D2AM

ID6

Machine Diagnostics

BM5

Optics

ID9

White Beam

BM7/CRG

Graal

ID10

Troïka

BM8/CRG

Gilda

ID11

Materials Science

BM14

MAD

ID12

Circular Polarisation (UHV)

BM16

Powder Diffraction

ID13

Microfocus

BM29

EXAFS

ID15

High Energy

BM32/CRG

IF Interface Studies

ID16

Inelastic Scattering

 

 

ID17

Medical

 

 

ID18

Mössbauer

 

 

ID19

Topography

 

 

ID20

Magnetic Scattering (UHV)

 

 

ID24

Dispersive EXAFS

 

 

ID30

High Pressure

 

 

ID32

Surface Science (UHV)

 

 

FRONT-ENDS READY FOR RADIATION TESTS OR TO DELIVER BEAM (5 IDs, 3BMs)

ID1

Anomalous Scattering

(FE ready for radiation tests - July 96)

ID14

Protein Crystallography

(FE ready for radiation tests - August 96)

ID21

X-ray Microscopy (UHV)

(FE ready for radiation tests - October 96)

ID22

X-ray Fluorescence Probe

(FE ready for radiation tests - September 96)

ID26

XAUS (UHV)

(FE to be completed by July 96 - radiation tests October 96)

BM26/CRG

Dubble (wide beam)

(FE to be completed by July 96 - radiation tests November 96)

BM28/CRG

XMAS

(FE ready for delivering beam)

BM30/CRG

FIP (wide beam)

(FE ready for radiation tests - July 96)

FRONT-ENDS ALMOST FULLY INSTALLED (5IDs, 3BMs)

ID23

Not used

 

ID27

Front-end test

 

ID28

Not used

(FE to be completed end 96)

ID29

Not used

(FE to be completed 97)

ID31

Not used

(FE to be completed 97)

BM20/CRG

ROBL

(FE to be completed before end 96 - radiation tests 97)

BM27

Not used

(FE will be completed end 96)

BM31

Not used

(Module 1 installed to be used vacuum group tests before end 96)

Table 2: Status of front-ends as of June 1996.